| Total 107 projects are covered in this issue. Updated between Sep 28- Oct 07 26 |
|
Data Centre
|
|
|
Amanthin Info Parks has proposed expansion of MU2 Data Centre at Turbhe, Navi Mumbai.
Amanthin Info Parks has proposed expansion of MU2 Data Centre at Turbhe,
Navi Mumbai.
Amanthin Info Parks has proposed...Read More
|
|
ReNew is setting up data-centre and allied infrastructure programme at Khalapur,
ReNew is setting up data-centre and allied infrastructure programme at
Khalapur,
ReNew signed an Invest Maharashtra MoU proposing ₹70,000
crore for a...Read More
|
|
Solar
|
|
|
Development of Navitas Solar integrated clean-energy manufacturing and solar programme at Gujarat and Maharashtra
Development of Navitas Solar integrated clean-energy manufacturing and
solar unit in Gujarat / Maharashtra
Navitas Solar announced a five-year,
approximately ₹10,000 crore integrated...Read More
|
|
Cement
|
|
|
JK Lakshmi Cement has proposed clinker and grinding-units in Assam.
JK Lakshmi Cement has proposed clinker and grinding-units in Assam.
The
Assam Cabinet approved JK Lakshmi Cement's approximately ₹11,000 crore
programme for one...Read More
|
|
My Home Industries is setting up Grinding unit at Kalinganagar
My Home Industries is setting up Grinding unit at Kalinganagar. The company
has received State level clearance for the project.
May 2017...Read More
|
|
ACC plans for cement grinding unit at Salai Banwa in Uttar Pradesh.
ACC plans for cement grinding unit at Salai Banwa in Uttar Pradesh.
Land
acquisition and other actions for the grinding unit at...Read More
|
|
Apartment
|
|
|
Yash Developments has proposed expansion of Residential Project at Kandivali
Yash Developments has proposed expansion of Residential Project at
Kandivali
Yash Developments has proposed expansion of its residential
project at Bhatt...Read More
|
|
Harivishva Developers is constructing residential complex 'Harivishva Infinia' in Pune district of Maharashtra.
Harivishva Developers is constructing a residential complex 'Harivishva
Infinia' in Pune district of Maharashtra.
The project will see
construction of three buildings...Read More
|
|
Harasiddh Corporation has proposed redevelopment of Sahayog SRA CHS at Malad East
Harasiddh Corporation has proposed redevelopment of Sahayog SRA CHS at
Malad East
Harasiddh Corporation proposes the Sahayog SRA CHS
residential and commercial...Read More
|
|
Wave Group plans a new luxury housing project township named 'Eden' in Ghaziabad, Uttar Pradesh.
Wave Group plans a new luxury housing project township named 'Eden' in
Ghaziabad, Uttar Pradesh.
4 towers (G+32 floors), 512...Read More
|
|
Venkata Praneeth Developers is developing residential villas Praneeth Pranav Grove in Hyderabad dist, Telangana.
Venkata Praneeth Developers is developing residential villas Praneeth
Pranav Grove in Hyderabad dist, Telangana.
The project will include 884
villas along with...Read More
|
|
Water
|
|
|
Implementtion of Assam Sustainable Wetland and Integrated Fisheries Transformation Project at assam.
Implementtion of Assam Sustainable Wetland and Integrated Fisheries
Transformation Project at assam.
The Assam Cabinet approved the
approximately ₹796.88 crore Sustainable Wetland and...Read More
|
|
Industrial Estate
|
|
|
Rolex Processors has proposed Industrial Shed Projec at Bhilwara
Rolex Processors has proposed Industrial Shed Projec at Bhilwara
Rolex
Processors has proposed a ₹74.28 crore industrial shed at Village...Read More
|
|
Engineering Projects is setting up construction of a new shed at Indira Dock, Mumbai,
Engineering Projects is setting up construction of a new shed at Indira
Dock, Mumbai, for Mumbai Port Authority.
Oct 2026 : Project...Read More
|
|
Airport
|
|
|
Development & Upgradation of Existing Airport at Saharsa for Code-2B Aircraft
Development & Upgradation of Existing Airport at Saharsa for Code-2B
Aircraft
The Bihar government is spending ₹147 crore to acquire 12
acres...Read More
|
|
Drugs & Pharma
|
|
|
Allmaker Technologies has proposed Pharmaceutical and Pesticide Intermediates Unit in Sonipat
Establishment of Pharmaceutical and Pesticide Intermediates Manufacturing
Unit in Sonipat
A pharmaceutical and pesticide intermediates
manufacturing unit has been proposed in
Sonipat, Haryana, with...Read More
|
|
Alchem Synthon has been proposed Establishment of Fine and Specialty Chemicals Facility at Ambernath
Alchem Synthon has been proposed Establishment of Fine and Specialty
Chemicals Manufacturing Facility at Ambernath
Alchem Synthon is
proposing a Fine, Specialty and...Read More
|
|
Danopharm Chemicals has proposed Expansion of Drug Intermediates and API Facility at Bharuch
Danopharm Chemicals has proposed Expansion of Drug Intermediates and API
Manufacturing Facility at Bharuch Gujarat
existing synthetic organic
chemicals manufacturing unit is proposed...Read More
|
|
Sypram Healthcare is setting up API mfg unit in Banaskantha.
Sypram Healthcare is setting up API mfg unit in Banaskantha.
Sept 2025 :
Project is still in planning stage due to awaiting...Read More
|
|
Besi Drugs is plans to set up API and drug intermediate unit in Nashik Maharashtra
Besi Drugs is plans to set up API and drug intermediate manufacturing
facility unit in Nashik Maharashtra
existing 45.51 MT/month...Read More
|
|
Construction
|
|
|
CPWD is setting up construction of NECTAR permanent campus at Mawdiangdiang.
CPWD is setting up construction of NECTAR permanent campus at
Mawdiangdiang.
Sept 2025 : Project is still in planning stage due to...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
PWD Tripura is setting up administrative building construction at Gondatwisa, Tripura.
PWD Tripura is setting up administrative building construction at
Gondatwisa, Tripura.
Project is still in planning stage due to tendering
process is going...Read More
|
|
Infinity Associates is setting up legacy milestone residential project at Pune.
Infinity Associates is setting up legacy milestone residential project at
Pune.
Project is still in planning stage due to environmental clearance
is awaited.
March...Read More
|
|
Dyes & Pigments
|
|
|
Alpha Chemex has proposed Establishment of Dyes and Dyes Intermediate unit at Jalore
Alpha Chemex has proposed Establishment of Dyes and Dyes Intermediates
manufacturing unit at Jalore Rajasthan
Alpha Chemex has proposed a Dyes
and Dyes...Read More
|
|
Hema Dyechem is setting up mfg of dyes intermediates & API Intermediates at Pardi, Valsad.
Hema Dyechem is setting up mfg of dyes intermediates & API Intermediates
from 110 TPM to 1040 TPM at Pardi, Valsad.
March...Read More
|
|
Solid Waste recyling
|
|
|
Biotic Waste Limited is plans to set up Common Biomedical Waste Treatment Facility unit in C S Nagar Maharashtra
Biotic Waste Limited is plans to set up Common Biomedical Waste Treatment
Facility unit in C S Nagar Maharashtra
), which...Read More
|
|
Municipal Corporation Faridabad is setting up solid waste management services in West Zone, Faridabad.
Municipal Corporation Faridabad is setting up solid waste management
services in West Zone,
Faridabad.
March 2026 : Project is still in
planning stage due...Read More
|
|
Municipal Corporation Faridabad is setting up solid waste management services in Middle Zone, Faridabad.
Municipal Corporation Faridabad is setting up solid waste management
services in Middle
Zone, Faridabad.
March 2026 : Project is still in
planning stage due...Read More
|
|
Municipal Corporation Faridabad is setting up solid waste management services in East Zone, Faridabad.
Municipal Corporation Faridabad is setting up solid waste management
services in East Zone,
Faridabad.
March 2026 : Project is still in
planning stage due...Read More
|
|
Metro Rail
|
|
|
BMRCL plans to develop Metro Phase III.
BMRCL plans to develop 133-km Metro Phase III.
Package 1 consist of
constructions between Silk Board and Bellandur (four Metro stations)
running to...Read More
|
|
Construction of Elevated Viaduct and Twin Tunnel with Underground Stations at Indore
Construction of Elevated Viaduct and Twin Tunnel with Underground Stations
at Indore Madhya Pradesh
Design and Construction of Elevated Viaduct,
Twin...Read More
|
|
Textile
|
|
|
Construction of textile dyeing and printing centre at Nadukani, Kannur.
Construction of textile dyeing and printing centre at Nadukani,
Kannur.
Bids are invited for appointment of consultant for setting up a
brand new...Read More
|
|
Babji Industrial is setting up polyester staple fiber in Neemuch, Madhya Pradesh.
Babji Industrial is setting up polyester staple fiber in Neemuch, Madhya
Pradesh.
with an annual production capacity of 60 tonnes. The...Read More
|
|
Quary
|
|
|
Devi Mines & Minerals is setting up production of decorative stone from the Toyaput decorative stone deposit.
Devi Mines & Minerals is setting up production of decorative stone from the
Toyaput decorative stone deposit in Orissa
over an area...Read More
|
|
Building Material
|
|
|
Giridhan Metal is setting up slag grinding unit at Paschim Bardhaman.
Giridhan Metal is setting up slag grinding unit with a capacity of 0.396
MTPA at Paschim Bardhaman.
Sept 2026 : Project is...Read More
|
|
Iron & Steel
|
|
|
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
proposed a
submerged arc furnace facility with a maximum capacity of
0.108616 MTPA
covering...Read More
|
|
RPA Ferro Industries is setting up expansion of sponge iron mfg plant at Dharwad.
RPA Ferro Industries is setting up expansion of sponge iron mfg plant at
Dharwad.
(up gradation of existing 1×100 TPD kiln...Read More
|
|
S N N Minerals is setting up iron ore beneficiation plant in Sundargarh.
S N N Minerals is setting up iron ore beneficiation plant in
Sundargarh.
iron ore beneficiation plant with a throughput
capacity of
8,00,000 TPA...Read More
|
|
Icon Steel India plans to set up a sponge iron unit in Chandrapur, Maharashtra.
Icon Steel India plans to set up a sponge iron unit in Chandrapur,
Maharashtra.
The Maharashtra government signed MoU with company on...Read More
|
|
Nirbhaya Industries is setting up expansion of existing plant by installing a DRI plant at Bhandara.
Nirbhaya Industries is setting up expansion of existing plant by installing
a DRI plant at Bhandara.
installing a DRI Plant with a...Read More
|
|
Sri Venkatesh Iron & Alloy plans to set up a billet caster unit at Lapanga, Ramgarh in Hazaribagh
Sri Venkatesh Iron & Alloy (India) plans to set up a billet caster unit in
at Lapanga village, Ramgarh in Hazaribagh...Read More
|
|
Krishna Godavari Power Utilities plans for Integrated Ferro alloy & steel complex at Nalgonda dist, Telangana.
Krishna Godavari Power Utilities plans for Integrated Ferro Alloy & Steel
complex at Irikigudem village, Dhamarcharla Mandal, Nalgonda dist,
Telangana.
Environmental clearance is...Read More
|
|
Anjaneya Ispat Limited has proposed the expansion of coke oven plant and Captive Power Plant at Saraikela
Anjaneya Ispat Limited has proposed existing non-recovery type coke oven
plant and Captive Power Plant at Saraikela Kharsawan
Jharkhand
non-recovery type coke...Read More
|
|
Anindita Steels Limited has proposed the expansion of its DRI plant at Senegarha
Anindita Steels Limited has proposed the expansion of its DRI (Sponge Iron)
plant at Senegarha, Rabodh, Hazaribagh, Jharkhand
The
company is
proposing to enhance...Read More
|
|
Anindita Steels is setting up Rolling Mill at Hazaribagh
Anindita Steels is setting up Rolling Mill at Hazaribagh
set up a
Rolling Mill with a capacity of 0.132 MTPA in
the existing...Read More
|
|
Bansal Aradhya Steel has proposed Expansion of Industrial at Halavarthy, Davangere
Bansal Aradhya Steel has proposed Expansion of Industrial at Halavarthy,
Davangere
Oct 2026 : Project has been commissioned.
...Read More
|
|
G.R. Krishna Ferro Alloys has proposed establishment of a DRI-based integrated steel plant at Chadrapur
G.R. Krishna Ferro Alloys has proposed establishment of a DRI-based
integrated steel plant at Chadrapur
G.R. Krishna Ferro Alloys has
proposed establishment...Read More
|
|
Sri Vela Smelters is setting up Expansion of Steel Melting and Rolling Mill unit in Namakkal
Sri Vela Smelters Private Limited is setting up Expansion of Steel Melting
and Rolling Mill unit in Namakkal Tamil Nadu
expansion of...Read More
|
|
Industrial Gases
|
|
|
Giridhan Metal Private Limited is plans to set up Oxygen Plant at Jamuria
Giridhan Metal Private Limited is plans to set up Oxygen Plant at
Jamuria
proposed an oxygen plant with a capacity of 0.066...Read More
|
|
Tyres & Tubes
|
|
|
CEAT Limited is planning to expand its two-wheeler tyre facility at Butibori,
CEAT Limited is planning to expand its two-wheeler tyre manufacturing
facility at Butibori,
CEAT Ltd. has approved a phased expansion of its
two-wheeler...Read More
|
|
Irrigation
|
|
|
Tripura PWD is setting up construction of 213 Deep Tubewell Minor Irrigation Schemes (DTWMIS) in 8 Districts of Tripura.
Tripura PWD is setting up construction of 213 Deep Tubewell Minor
Irrigation Schemes (DTWMIS) in 8 Districts of Tripura.
Construction of
213 Deep...Read More
|
|
Tripura PWD is setting up 39 DTW irrigation schemes in Tripura.
Tripura PWD is setting up nstruction of 213 Deep Tubewell Minor Irrigation
Schemes (DTWMIS) in 8 Districts of Tripura.
SH: Construction of...Read More
|
|
Hospital
|
|
|
Urban Development Department is setting up 300 Beds multispecialty hospital at Kh. No. 157 at Mouza - Watho.
Urban Development Department is setting up 300 Beds multispecialty hospital
at Kh. No. 157 at Mouza - Watho.
March 2025 :...Read More
|
|
AIG Hospitals is setting up a new, greenfield multispeciality hospital in Visakhapatnam,
AIG Hospitals is setting up a new, greenfield multispeciality hospital in
Visakhapatnam,
he facility will be built in two phases comprising...Read More
|
|
Aaman Public Charitable Trust has proposed to develop hospital at Khalilabad
Aaman Public Charitable Trust has proposed to develop a 650-bed hospital at
Khalilabad...Read More
|
|
Construction Work of Homeopathic College and Hospital at Ambala Cant
Construction Work of Homeopathic College and 25-Bed Hospital at Ambala
Cant
Completion of remaining/balance construction for the college and
hospital blocks (intake...Read More
|
|
Ram Krishna Educational Trust For Youth is setting up medical college and hospital project at Patna.
Ram Krishna Educational Trust For Youth is setting up medical college and
hospital project at Patna.
Oct 2026: Project is still in...Read More
|
|
Apollo Hospital has proposed development of Hospital and Medical College in Hyderabad
Apollo Hospitals Enterprise Limited has proposed development of Hospital
and Medical College in Hyderabad
Apollo Hospitals Enterprise has
proposed development of a Hospital...Read More
|
|
Electronic Products
|
|
|
Development of 3D Projection Mapping Light & Sound Show facility at Khatu Shyam Ji,
Development of a 3D Projection Mapping–based Light and Sound Show at
Khatu Shyam Ji, Sikar, Rajasthan, on a turnkey basis, including...Read More
|
|
Chemical
|
|
|
Greenlam Industries is setting up resin mfg unit in Sabarkantha.
Greenlam Industries is setting up resin mfg
unit in
Sabarkantha.
existing
laminate facility at Oran, Prantij Taluka,
Sabarkantha District, Gujarat. The unit aims to produce
3,700...Read More
|
|
Eskay Speciality Chemicals is plans to set up Chemical Production in Surat
Eskay Speciality Chemicals is plans to set up Chemical
Production in
Surat
amendment now seeks to increase the production capacity
of
Selenium Sulphide from...Read More
|
|
Navin Fluorine International is setting up specialty chemicals production at its existing plant in Bhestan, Chorasi Taluk, Surat District.
Navin Fluorine International is setting up specialty chemicals production
at its existing plant in Bhestan, Chorasi Taluk, Surat District.
Project
is still in...Read More
|
|
Benzo Chem is plans to set up of Chemical Manufacturing Unit at Dasarkhed
Benzo Chem Industries Private Limited is plans to set up sof Chemical
Manufacturing Unit at Dasarkhed in Buldhana District,
Maharashtra
expansion of...Read More
|
|
Construction
|
|
|
CPWD is setting up construction of NECTAR permanent campus at Mawdiangdiang.
CPWD is setting up construction of NECTAR permanent campus at
Mawdiangdiang.
Sept 2025 : Project is still in planning stage due to...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
PWD Tripura is setting up administrative building construction at Gondatwisa, Tripura.
PWD Tripura is setting up administrative building construction at
Gondatwisa, Tripura.
Project is still in planning stage due to tendering
process is going...Read More
|
|
Infinity Associates is setting up legacy milestone residential project at Pune.
Infinity Associates is setting up legacy milestone residential project at
Pune.
Project is still in planning stage due to environmental clearance
is awaited.
March...Read More
|
|
Auto Ancillaries
|
|
|
Maruti Suzuki is plans to establish second car manufacturing plant at Khoraj Industrial Estate in Gujarat.
Maruti Suzuki is plans to establish second car manufacturing plant at
Khoraj Industrial Estate in Gujarat.
with a capacity to produce...Read More
|
|
Speciality Chemicals
|
|
|
New Alliance Fine Chem is setting up synthetic and inorganic chemicals unit at Tarapur.
New Alliance Fine Chem is setting up synthetic and inorganic chemicals unit
at Tarapur.Maharashtra
.
project involves production of 1,119 TPM
synthetic organic...Read More
|
|
Synthetic Chemicals
|
|
|
Pearl Colours Industries is setting up synthetic organic chemicals in Vapi, Tal.: Pardi, Dist.: Valsad.
Pearl Colours Industries is setting up synthetic organic chemicals in Vapi,
Tal.: Pardi, Dist.: Valsad.
March 2025 : Project is still in...Read More
|
|
Shekhawati Global Chemicals is setting up epoxy resin plant at RIICO Parbatsar.
Shekhawati Global Chemicals is setting up epoxy resin plant at RIICO
Parbatsar.
The project has a plot area of 4,030 sq m...Read More
|
|
Mining
|
|
|
Golcha Minera is set up pyrophyllite and soapstone mining unit in Bhilwara
Golcha Mineral Private Limited is set up pyrophyllite and soapstone mining
unit in Bhilwara
Golcha Mineral Private Limited has applied for
environmental...Read More
|
|
Ukni Deep Opencast Mine (OCM) in Wani North Area, Maharashtra.
Ukni Deep Opencast Mine (OCM) in Wani North Area, Maharashtra.
Bids are
invited for handling, transport, and mining services of the project.
The
contract...Read More
|
|
Balaji Stone Mines And Minerals is setting up stone mining project expansion at Hirwas village Sikar District.
Balaji Stone Mines And Minerals is setting up stone mining project
expansion at Hirwas village Sikar District.
from 8610 TPA
(ROM) to
604660 TPA...Read More
|
|
Railway
|
|
|
Doubling of Barbil-Bolanikhadan rail line at Orissa
Doubling of Barbil-Bolanikhadan rail line at Orissa
Indian Railways has
approved ₹122 crore for doubling the 6 km Barbil-Bolanikhadan section of
South Eastern...Read More
|
|
Road/Highway
|
|
|
Varanasi-Kolkata Greenfield Expressway Package-5
Varanasi-Kolkata Greenfield Expressway Package-5
National Highways
Authority of India proposes Package-5 of the Varanasi-Kolkata Greenfield
Expressway under Bharatmala Pariyojana Phase-II.
The 235.3 km package...Read More
|
|
Upgradation of Narmadapuram-Timarni Road in Madhya Pradesh.
Upgradation of Narmadapuram-Timarni Road in Madhya Pradesh.
BCC
Buildtech has been declared the lowest bidder (L1) for the
project.
Project will be executed under...Read More
|
|
Improvement of NH-731A Lal Gopalganj Bypassed Section in uttar pradesh
Improvement of NH-731A Lal Gopalganj Bypassed Section in uttar
pradesh
MoRTH EPC tender for one-time improvement of the existing
bypassed section of...Read More
|
|
College
|
|
|
PWD is setting up medical college and hospital /lab block at SKIMS Bemina
PWD is setting up college/lab block at SKIMS
Bemina
Project is still in
planning stage due to tendering process is going on.
Sept 2026...Read More
|
|
Convention Centre
|
|
|
Greenpark Hotels And Resorts is setting up additional convention centre at forum vijaya complex at Chennai.
Greenpark Hotels And Resorts is setting up additional convention centre at
forum vijaya complex at Chennai.
Sept 2026 : Project is still...Read More
|
|
RackBank Datacenters Private Limited is plans to set up data centre in Indore
RackBank Datacenters Private Limited is plans to set up data centre in
Indore
RackBank has announced plans to build a purpose-built AI...Read More
|
|
Engineering
|
|
|
Travancore Titanium Products is setting up engineering design of plaster of paris plant in Thiruvananthapuram.
Travancore Titanium Products is setting up engineering design of plaster of
paris plant in Thiruvananthapuram.
Project is still in planning stage
due to...Read More
|
|
Construction
|
|
|
CPWD is setting up construction of NECTAR permanent campus at Mawdiangdiang.
CPWD is setting up construction of NECTAR permanent campus at
Mawdiangdiang.
Sept 2025 : Project is still in planning stage due to...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
PWD Tripura is setting up administrative building construction at Gondatwisa, Tripura.
PWD Tripura is setting up administrative building construction at
Gondatwisa, Tripura.
Project is still in planning stage due to tendering
process is going...Read More
|
|
Infinity Associates is setting up legacy milestone residential project at Pune.
Infinity Associates is setting up legacy milestone residential project at
Pune.
Project is still in planning stage due to environmental clearance
is awaited.
March...Read More
|
|
Warehouse/Cold store
|
|
|
Vishal Vividh Karyakari Seva Sahakari Sanstha is setting up construction of a new warehouse at Latur.
Vishal Vividh Karyakari Seva Sahakari Sanstha is setting up construction of
a new warehouse at Latur.
Warehouse (1035 MT) and Shed (239.25...Read More
|
|
Coal
|
|
|
1,200 MW Mutiara Thermal Power Plant in Tuticorin.
1,200 MW Mutiara Thermal Power Plant in Tuticorin.
Coastal Energen and
now owned through Adani Group company Moxie Power Generation, has awarded
Power...Read More
|
|
DVC-CIL is developing Chandrapura Thermal Power Station in Jharkhand
DVC-CIL is developing Chandrapura Thermal Power Station in
Jharkhand
DVC CIL Power Private Limited, a 50:50 joint venture of
Damodar Valley Corporation...Read More
|
|
IT
|
|
|
Micromitti Real Estate Ventures is setting up ‘Cybercity’, an AI-focused private IT park on the super corridor in Indore.
Micromitti Real Estate Ventures is setting up ‘Cybercity’, an
AI-focused private IT park on the super corridor in Indore.
Micromitti
Real Estate Ventures...Read More
|
|
Distillary/Alcohol
|
|
|
Sant Muktai Sugar is plans to set up grain-based distillery in Jalgaon,
Sant Muktai Sugar And Energy Limited is plans to set up grain-based
distillery in Jalgaon, Maharashtra
March 2025 : Project...Read More
|
|
Babanraoji Shinde Sugar and Allied Industries is setting up expansion of the co-generation power plant unit in Solapur
Babanraoji Shinde Sugar and Allied Industries is setting up expansion of
the co-generation power plant unit in Solapur
expansion of the
co-generation power
plant...Read More
|
|
Babanraoji Shinde Sugar and Allied Industries is setting up molasses based distillery unit in Turkpimpari.
Babanraoji Shinde Sugar and Allied Industries is setting up molasses based
distillery expansion from 60 to
200 KLPD at Turkpimpari
March 2026 :
Project...Read More
|
|
WHR/Cogeneration
|
|
|
Sidhe Petrochemicals is setting up cogeneration power plant at Bhimasar, Kutch.
Sidhe Petrochemicals is setting up 14 MW cogeneration power plant at
Bhimasar, Kutch.
proposed synthetic organic
chemicals manufacturing
facility along with a 14 MW...Read More
|
|
Garments & Apparels
|
|
|
Indo Accord Apparels has proposed a garment factory industrial building project in Bhopal,
Indo Accord Apparels has been proposed Garment factory industrial building
in bhopal.
An industrial building for a garment factory has been
proposed at...Read More
|
|
Education
|
|
|
Construction of Alvas Engineering College in Dakshina Kannada
Construction of Alvas Engineering College in
Dakshina Kannada
Alva’s
Education Foundation has proposed construction of Alvas Engineering
CollegeThe project involves development of
an engineering education...Read More
|
|
Assam Government IITG Healthcare Foundation is setting up healthcare R&D in Guwahati.
Assam Government IITG Healthcare Foundation is setting up Healthcare R&D,
including a super-specialty hospital, PG medical and allied education
facilities, and ancillary...Read More
|
|
Iron & Steel
|
|
|
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
proposed a
submerged arc furnace facility with a maximum capacity of
0.108616 MTPA
covering...Read More
|
|
RPA Ferro Industries is setting up expansion of sponge iron mfg plant at Dharwad.
RPA Ferro Industries is setting up expansion of sponge iron mfg plant at
Dharwad.
(up gradation of existing 1×100 TPD kiln...Read More
|
|
S N N Minerals is setting up iron ore beneficiation plant in Sundargarh.
S N N Minerals is setting up iron ore beneficiation plant in
Sundargarh.
iron ore beneficiation plant with a throughput
capacity of
8,00,000 TPA...Read More
|
|
Icon Steel India plans to set up a sponge iron unit in Chandrapur, Maharashtra.
Icon Steel India plans to set up a sponge iron unit in Chandrapur,
Maharashtra.
The Maharashtra government signed MoU with company on...Read More
|
|
Nirbhaya Industries is setting up expansion of existing plant by installing a DRI plant at Bhandara.
Nirbhaya Industries is setting up expansion of existing plant by installing
a DRI plant at Bhandara.
installing a DRI Plant with a...Read More
|
|
Sri Venkatesh Iron & Alloy plans to set up a billet caster unit at Lapanga, Ramgarh in Hazaribagh
Sri Venkatesh Iron & Alloy (India) plans to set up a billet caster unit in
at Lapanga village, Ramgarh in Hazaribagh...Read More
|
|
Krishna Godavari Power Utilities plans for Integrated Ferro alloy & steel complex at Nalgonda dist, Telangana.
Krishna Godavari Power Utilities plans for Integrated Ferro Alloy & Steel
complex at Irikigudem village, Dhamarcharla Mandal, Nalgonda dist,
Telangana.
Environmental clearance is...Read More
|
|
Anjaneya Ispat Limited has proposed the expansion of coke oven plant and Captive Power Plant at Saraikela
Anjaneya Ispat Limited has proposed existing non-recovery type coke oven
plant and Captive Power Plant at Saraikela Kharsawan
Jharkhand
non-recovery type coke...Read More
|
|
Anindita Steels Limited has proposed the expansion of its DRI plant at Senegarha
Anindita Steels Limited has proposed the expansion of its DRI (Sponge Iron)
plant at Senegarha, Rabodh, Hazaribagh, Jharkhand
The
company is
proposing to enhance...Read More
|
|
Anindita Steels is setting up Rolling Mill at Hazaribagh
Anindita Steels is setting up Rolling Mill at Hazaribagh
set up a
Rolling Mill with a capacity of 0.132 MTPA in
the existing...Read More
|
|
Bansal Aradhya Steel has proposed Expansion of Industrial at Halavarthy, Davangere
Bansal Aradhya Steel has proposed Expansion of Industrial at Halavarthy,
Davangere
Oct 2026 : Project has been commissioned.
...Read More
|
|
G.R. Krishna Ferro Alloys has proposed establishment of a DRI-based integrated steel plant at Chadrapur
G.R. Krishna Ferro Alloys has proposed establishment of a DRI-based
integrated steel plant at Chadrapur
G.R. Krishna Ferro Alloys has
proposed establishment...Read More
|
|
Sri Vela Smelters is setting up Expansion of Steel Melting and Rolling Mill unit in Namakkal
Sri Vela Smelters Private Limited is setting up Expansion of Steel Melting
and Rolling Mill unit in Namakkal Tamil Nadu
expansion of...Read More
|
|
Commercial Complex
|
|
|
Manglam Group plans a commercial real estate project named 'Summit Signature Sangam' along Ajmer Road–Civil Lines corridor in Jaipur.
Manglam Group plans a commercial real estate project named 'Summit
Signature Sangam' along Ajmer Road–Civil Lines corridor in Jaipur.
The
project is developed...Read More
|
|
Eastern Estates Construction And Developers is setting up Diamond City residential complex at Thana, Ranchi.
Eastern Estates Construction And Developers is setting up Diamond City
residential complex at Thana, Ranchi
April 2025 :Project is
under-construction and expected for...Read More
|
|
Water Supply
|
|
|
Andaman Public Works Department (APWD) is set up bachra pahar water supply scheme at Chouldari.
Andaman Public Works Department (APWD) is set up bachra pahar water supply
scheme at Chouldari in South Andaman Island
Aug 2023...Read More
|
|
Water Treatment
|
|
|
Construction of Main Pumping Station and Wastewater Treatment Facility at Dera Sachkhand Ballan
Construction of Main Pumping Station and Wastewater Treatment Facility at
Dera Sachkhand
Ballan Distt. Jalandhar
Part-B - Survey, Soil Testing,
Design, Supply and...Read More
|
|
Defence
|
|
|
Nibe Limited has proposed anchor defence unit at Ahilyanagar
Nibe Limited signed an Invest Maharashtra MoU proposing ₹11,590 crore for
an anchor defence-manufacturing unit at Ahilyanagar with about 3,300 jobs.
The...Read More
|
|
Conductor
|
|
|
Tata Group plans for semiconductor Fabrication at Dholera in Gujarat.
Tata Group plans for semiconductor Fabrication at Dholera in
Gujarat.
Company has finalised the details of the land for the plant and
is...Read More
|
|
Sugar
|
|
|
Babanraoji Shinde Sugar and Allied Industries is setting up expansion of Sugar unit in Solapur
Babanraoji Shinde Sugar and Allied Industries is setting up expansion of
Sugar unit in Solapur
from 5,000 TCD to 12,000 TCD,
March 2026...Read More
|
|
Hospitality
|
|
|
AIH Realty is setting up hotel building project named AIH Karyan at Ghaziabad.
AIH Realty is setting up hotel building project named AIH Karyan at
Ghaziabad.
project is a mixed-use high-rise tower (Ground +...Read More
|
|
Construction
|
|
|
CPWD is setting up construction of NECTAR permanent campus at Mawdiangdiang.
CPWD is setting up construction of NECTAR permanent campus at
Mawdiangdiang.
Sept 2025 : Project is still in planning stage due to...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
PWD Tripura is setting up administrative building construction at Gondatwisa, Tripura.
PWD Tripura is setting up administrative building construction at
Gondatwisa, Tripura.
Project is still in planning stage due to tendering
process is going...Read More
|
|
Infinity Associates is setting up legacy milestone residential project at Pune.
Infinity Associates is setting up legacy milestone residential project at
Pune.
Project is still in planning stage due to environmental clearance
is awaited.
March...Read More
|
|
Transmission Line
|
|
|
Development of Intra-State Transmission System with Battery Energy Storage Systems in multiple india
The Union Cabinet approved the ₹1,86,405 crore PM-DHARA programme to
strengthen intra-state transmission systems for evacuation of up to 135 GW
of...Read More
|
|
Jetty
|
|
|
Archean Chemical Industries is setting up captive salt jetty and associated infrastructure in Kachchh.
Archean Chemical Industries is setting up captive salt jetty and associated
infrastructure with through out of 7 MMTPA at Lakhpat, District...Read More
|
|
Education
|
|
|
Construction of Alvas Engineering College in Dakshina Kannada
Construction of Alvas Engineering College in
Dakshina Kannada
Alva’s
Education Foundation has proposed construction of Alvas Engineering
CollegeThe project involves development of
an engineering education...Read More
|
|
Assam Government IITG Healthcare Foundation is setting up healthcare R&D in Guwahati.
Assam Government IITG Healthcare Foundation is setting up Healthcare R&D,
including a super-specialty hospital, PG medical and allied education
facilities, and ancillary...Read More
|
|
Herbiside&Pesticide
|
|
|
Indo Amines is setting up pesticides, pesticides intermediates products in Raigad.
Indo Amines is setting up pesticides, pesticides intermediates, synthetic
organic chemicals, hydrogen, inorganic and blending & formulation products
in Raigad.
March 2025 :...Read More
|
|
Canals
|
|
|
Numaligarh Refinery is plans to set up EOT Cranes-Catalyst Handling at Golaghat, Assam
Numaligarh Refinery is plans to set up EOT Cranes-Catalyst Handling at
Golaghat, Assam
March 2026: Project is still in planning stage...Read More
|